Call Your Designer Before You Sign the Lease

The cheapest design decisions happen before you sign a lease or hire a contractor. Here's what a designer catches early, from a designer who came up on the construction side.

Call Your Designer Before You Sign the Lease

Most business owners call a designer after the lease is signed, the contractor is lined up and the opening date is on the calendar. By then, a lot of the expensive decisions are already made. Here's my case for calling sooner, from someone who has sat on the construction side of that table.

Before the lease: what can this space actually hold?

A floor plan on a listing tells you square footage. It doesn't tell you whether your six exam rooms, two restrooms, a break room and storage fit with real clearances, or whether the plumbing is anywhere near where your sinks need to go. A quick test fit before you sign can save you from a space that looks perfect and works terribly.

It also helps you negotiate. If you know the space needs new restrooms, more electrical or a reworked entry, you can ask for that in your tenant improvement allowance instead of paying for it later.

Before the contractor: drawings that can be priced

Contractors price what's drawn. Vague drawings get padded numbers, allowances and, later, change orders. A complete set, with a finish schedule that says exactly what goes on every floor and wall, gets you bids you can actually compare.

Every question you answer on paper is one you don't pay to answer on site.

Lead times are the quiet schedule killer

Some light fixtures, plumbing fixtures, specialty tile and furniture take weeks or months to arrive. When those are picked late, your opening date moves, or you settle for whatever's in stock. Picking finishes early means ordering early, and that keeps the schedule honest.

What we look at first

  • Whether your program (rooms, people, equipment) fits the footprint.
  • Where plumbing, power and data already are, and what moving them costs.
  • Accessibility: entries, restrooms, routes and counters.
  • How the space will look and feel against your brand.
  • The finishes and furniture with long lead times.

What it costs you to wait

Nothing dramatic, usually. Just a lot of small things: a wall that has to move, a fixture that's backordered, a counter that needs rebuilding to meet code, a room that's a little too small for what you do. Each one is a change order. Together they're your budget and your opening date.

If you're looking at spaces now, bring us in for a test fit. It's one of the most useful things we do, and it's a lot cheaper than finding out later.

Until next time,
Airi xo
FOR CLIENTS
KEEP READINGMORE FROM THE JOURNALALL ENTRIES

Letters from the studio.

New journal entries, the occasional project reveal, and nothing you didn't ask for.

A few times a season. Never more.

Airi

Thoughtful interiors and considered identities.

THE STUDIO

Newnan, Georgia
hello@airi.studio
770.629.8434

FOLLOW

InstagramPinterestLinkedInFacebook

© 2026 AIRI STUDIOPRIVACYTERMSCLIENT PORTALTEAM LOGIN